DMS completed the installation of a comprehensive landfill gas (LFG) management system at the Twin Creeks Landfill in Southwestern Ontario. The project included the installation of dual 36-inch HDPE landfill gas headers from the landfill collection system to the flare system inlet, along with moisture separators, condensate management equipment, gas blowers, and enclosed flares.
Our scope included process piping, millwrighting and rigging, steel fabrication, and civil construction to support the complete mechanical installation. All work was performed in accordance with CSA B149.6 and applicable TSSA regulations, ensuring a safe, reliable, and compliant landfill gas management system.


