DMS completed multiple work packages as part of an existing composting plant’s expansion project in Southwestern Ontario. Across these packages, DMS carried out the mechanical installation and renovation of multiple pump houses, yard piping, structural steel fabrication and installation, and concrete and civil works. The piping systems installed included digester gas, digestate, compressed air, and plant water.
Digester gas piping was installed to TSSA DLB-2020, with all piping fabricated to ASME B31.3 and 5% X-ray non-destructive examination (NDE) weld inspection. Equipment installed included pumps, heat exchangers, mixers, grinders, and other ancillary components. Through coordinated execution across multiple work packages, DMS delivered safe, reliable, and code-compliant upgrades to support the facility’s expansion.